Woodside Navigation Aid Refurbishments
TAMS’ Scope of Work:
– Demolition of existing structures on four navigation aids.
– Internal hydrodemolition of existing concrete strengthening and seabed to pile toe.
– Installation of clamped fender and bottom ladder arrangement through temporary access platform
– Pile strengthening utilising N32 reo-cages and cementitious grout.
– Grouting of the connection splice (annulus).
– Application of pile corrosion prevention and sealant system , STOPAQ to the spliced connection.
– Installation and commissioning of new range lights and navigation aid lanterns, incorporating GSM monitoring and control systems.